Skip to Content

Placer les contrôles qualité dans le flux de production

Contrôler au moment où une décision peut encore changer le résultat.
October 2, 2026 by
Placer les contrôles qualité dans le flux de production
DYONYSOS

Start with the risk

Associate each control with a defect, requirement, and decision. A control without planned action mainly produces data.

Choose the trigger

Receipt, operation, quantity, frequency, lot or product determine when the control should appear.

Choose the right control type

Instruction, yes/no, measurement or photo respond to different uses. The interface must limit ambiguities in the field.

Handle a failed control

Blocking, quarantine, rework, override, scrap and corrective action require roles and traceability.

Close the loop

Analyze defects, causes, suppliers, work centers and versions. An action is complete only after its effect has been checked.

Test with operators

Input time, gloves, terminal, network, correction and training count as much as configuration.

Edition: structured quality control points belong to Odoo’s Enterprise edition; in Omnifloo Prod, they are available with an Odoo Enterprise licence, as an extra, at Odoo’s official price. Scrap and scrap reasons remain available in the core.

See industrial bricks

Comprendre le coût d’un ordre de fabrication
Séparer prévu, réalisé, valorisation et interprétation.