Start with the risk
Associate each control with a defect, requirement, and decision. A control without planned action mainly produces data.
Choose the trigger
Receipt, operation, quantity, frequency, lot or product determine when the control should appear.
Choose the right control type
Instruction, yes/no, measurement or photo respond to different uses. The interface must limit ambiguities in the field.
Handle a failed control
Blocking, quarantine, rework, override, scrap and corrective action require roles and traceability.
Close the loop
Analyze defects, causes, suppliers, work centers and versions. An action is complete only after its effect has been checked.
Test with operators
Input time, gloves, terminal, network, correction and training count as much as configuration.
Edition: structured quality control points belong to Odoo’s Enterprise edition; in Omnifloo Prod, they are available with an Odoo Enterprise licence, as an extra, at Odoo’s official price. Scrap and scrap reasons remain available in the core.