Skip to Content

Nomenclature, kit ou sous-traitance : choisir le bon type

Trois types de nomenclature, trois comportements de stock et de coût.
September 30, 2026 by
Nomenclature, kit ou sous-traitance : choisir le bon type
OdooBot

Manufacture this product

The standard bill of materials generates a manufacturing order: components are consumed, the finished product enters stock and is valued at closure according to the product costing method.

Diagram — Three bill of materials types and their effect on stock.
  • Manufacture this product

    • Manufacturing order
    • Finished product stocked
  • Kit

    • No manufacturing order
    • Components delivered instead
  • Subcontracting

    • Purchase of the finished product
    • Components consumed at the subcontractor

Kit

A kit is never manufactured or stocked: at delivery, and in the orders that use it, Odoo replaces it with its components. It suits commercial bundles and sets assembled at shipping time.

Subcontracting

The subcontracting bill of materials names the subcontractors who make the product. Purchasing the finished product triggers the consumption of components at their site.

Limits

The same product can have several bills of materials; the rule that picks the right one by quantity, variant or supplier must be tested on your real cases.

Sources

Odoo — bill of materials configuration

See the functional architecture

Interfaces machines : les questions à poser avant de promettre
Une fiche d’interface avant tout engagement.